BRIDGE UPGRADES

STRUCTURAL IMPROVEMENTS
64 AVENUE BNR OVERHEAD BRIDGE
CONTRACT NO. T11-65

Project Description Replacement of existing expansion joints over the piers, nosing block-outs, application of a sealant and road repair at abutment ends, extension of drainage system at substructure level, introduction of an additional drainage system at the ends of each expansion joint over the piers.
Project Location 64th Avenue BNR Overhead Bridge in Delta, B.C.
Duration of Project June 2011 – September 2011
Project Owner The Corporation of Delta