64th Avenue Overhead Road
Project Description
Replacement of existing expansion joints over the piers, nosing block-outs, application of a sealant and road repair at abutment ends, extension of drainage system at substructure level, introduction of an additional drainage system at the ends of each expansion joint over the piers.
Project Location
64th Avenue BNR Overhead Bridge in Delta, B.C.
Duration of Project
June 2011 – September 2011
Project Owner
The Corporation of Delta
Estimated Value
$283,472.20 Final Value $328,988.00