Alberta High Load Collision/Damage Repairs

Project Description

Traffic accommodation, Concrete deck / and median curb removal, Repair of structural steel by heat straightening, Replacement of structural steel members, Cathodic deck protection system work, Concrete deck replacement, Epoxy injection, Concrete partial depth repairs on deck underside and curbs and Surface preparation and painting.

Project Location

SE SEC 27 TWP, 49 RGE 25 W4M. Hwy. 2A over Hwy. 2 at Leduc, Alberta

Duration of Project

April 28, 2015 – August 28, 2015

Project Owner

Government of Alberta Transportation

Estimated Value

$1,194,294.00 Final Value $1,295,620.05