Gott Creek Bridge
Project Description
Construction of a new two lane, single span, 28 metre long bridge with Type 4 concrete “I”girders, cast in place concrete abutments, deck and parapets; construction of approx. 400 metres of asphalt paved approaches; and demolition and disposal of the existing wood structured bridge.
Project Location
Located on Highway 99, approximately 30 km south of Lillooet, BC.
Duration of Project
April to Nov 2010
Project Owner
Ministry of Transportation and Infrastructure Major Works
Estimated Value
$1,763,612.00 Final Value: $1,669,870.00